Case studies
The problem, the build, the outcome
Six engagements written up as the client described the problem and as the result was measured afterwards. Figures are marked where they are still awaiting client sign-off.
AI Automation
Publishing operations rebuilt around an intake pipeline
Read the case studyn8n Workflow Automation
Daily operational handoffs moved off spreadsheets
Read the case studyVoIP Solutions
Contact centre telephony rebuilt on SIP trunks
Read the case studyOdoo ERP
Month-end close shortened after an Odoo rollout
Read the case studyGoHighLevel
Speed-to-lead cut from most of a day to under two minutes
Read the case studyIT Infrastructure
Recovery time reduced from days to well under an hour
Read the case studyA note on the numbers
Where a figure appears on this site it should come from the client’s own reporting, measured before and after the change, and it should be published only with their permission. Where a result was partly caused by something else happening at the same time, that belongs in the write-up rather than being quietly omitted.
Placeholder figures. Replace with your own verified numbers before launch.
Tell me what is taking too long
Thirty minutes, no pitch. If automation is the wrong answer for your situation, you will hear that on the call.
Reply within one business day · NDA before any system detail is discussed